Supply and Installation of Mechanical and Electrical Equipment and Metal Transmission Line for Ayn al-Bayda Plateau Pumping Stations (Civil Works)
The project included the excavation and installation of two metal pipelines for water transportation used for irrigation purposes, with each pipe having a diameter of 140 cm and a thickness of 14 mm. Each pipeline section is 12 meters long and is externally insulated with bitumen. The two lines extend over a distance of 3,400 meters from the pumping station at the 16th of October Dam to a 50,000 m³ reservoir in the Ayn al-Bayda Plateau, designed to irrigate agricultural lands adjacent to the dam covering an area of 5,000 hectares. The project also includes the pipelines crossing over the dam's spillway, spanning 54 meters, making it one of the longest metal beams in the country.